TA6000

Integrated system

TA6000.

Battery and inverter in one cabinet, with PV input connectivity and three specified storage configurations. AC output options depend on the selected configuration.

INVERTER
Included
ENCLOSURE
Not specified
NOMINAL ENERGY
10.24–20.48 kWh
AC CONFIGURATION
120 V US / 230 V EU AC options
Start your project ↗

Specifications

Model / configurationEnergy (kWh)AC options (kW)
TA6000-M210.246–10
TA6000-M315.366–12
TA6000-M420.486–12

Specify the correct market AC voltage and 50 / 60 Hz option. PV input: 11 kW for M2; 11–13.2 kW for M3/M4. No three-phase or split-phase capability is claimed.

ModelDimensions (mm)Approx. kg
TA6000-M2590 × 570 × 1880 / W × D × H244
TA6000-M3590 × 570 × 1880 / W × D × H286
TA6000-M4590 × 570 × 1880 / W × D × H328

Communication: RS485 / RS232 / CAN / Wi-Fi; Bluetooth optional
Temperature: Operating −20 to 60 °C

Coast, central plateau or highlands: make the room part of the plan.

Tanzania’s climate changes with region and elevation, and its rainfall seasons vary between regions. Match useful household storage to your daily loads, with the equipment room’s heat, moisture and service space guiding the final format.

Temperature:
Operating −20 to 60 °C
ENCLOSURE
Not specified
01

Coastal home: fans, refrigeration and connectivity

In warmer coastal areas, selected fans, refrigeration and communications can form a useful planning group. A dry, sheltered utility room gives the equipment an organised setting away from daily living areas.

EU integrates the inverter and battery for a new indoor system; TR Pro supports a compatible 51.2 V inverter installation. Choose according to the circuit plan, room airflow and the exact model’s environmental limits.

Which fans, refrigeration and network devices belong on the selected circuits?
  • Can rain, coastal air or condensation reach the proposed equipment position?
02

Central home: protected storage in a dedicated room

Central areas include relatively dry climate zones. A protected utility space can support selected lights, the home office and household appliances while keeping dust and stored items away from the installation.

TR Pro offers a compact format; HP Ultra offers modular high-voltage storage when more energy is needed. Match battery voltage and communication to the inverter, then plan clear fixing, cable and service space.

How much energy is needed for the required backup hours?
  • How will dust, heat and access be managed in the proposed room?
03

Highland home: plan around the room’s temperature

Highland locations can differ from coastal conditions, and northeastern highlands have a different rainfall pattern from some central and southern regions. The actual equipment room provides the temperature and exposure inputs for selection.

A dry indoor system can serve the home-office and refrigeration plan without assuming the coast’s conditions. EU and TR Pro list charging from 0 °C; use model-specific temperature limits and retain cooling and service clearances.

What minimum and maximum room temperatures should the design cover?
  • Does the proposed room remain dry through its local rainy season?
Specifications
  • Start with average load and required hours to plan kWh, then check the compatible inverter’s running and starting output. More modules increase selected energy capacity within the supported system; they do not automatically increase AC output.
  • EU lists IP21 for a dry indoor installation. TR Pro and HP Ultra list IP66; standard TR and HP K list IP20 with IP54 optional, and TB rack lists IP20. Assess shelter, condensation and coastal corrosion separately from the IP code.
  • EU lists charging at 0 to 55 °C and discharging at −20 to 55 °C; TR Pro lists charging at 0 to 55 °C and discharging at −20 to 60 °C. HP Ultra’s temperature range needs confirmation for the selected configuration; optional heating is not a general sub-zero charging claim.

PRODUCT DETAIL / ORIGINAL LITERATURE

Every side. Every connection.

The supplied brochure provides two labelled connection/breaker insets and internal cabinet/cell illustrations on printed pages 15-16. Crops avoid visible product logos without AI editing, repainting, or invented structure. Embedded views not visibly matched to the printed product page were excluded. These views do not establish pinouts, cable sizes, commissioning steps or installation compatibility.

Original terminal labels
Original terminal labelsConnection panel labelled for load, grid, optional generator, PV and communication.
Terminal panel close-up
Terminal panel close-upClose-up of the cabinet terminal panel.
Original breaker labels
Original breaker labelsBattery, PV1, PV2, load and grid breakers in the illustrated compartment.
Breaker compartment close-up
Breaker compartment close-upCircuit breakers within the cabinet's breaker compartment.
Upper cabinet and service bay
Upper cabinet and service bayUpper cabinet compartment with the inverter and connection area.
Cell assembly detail
Cell assembly detailBattery cell tops in a partial internal illustration.

Know your interfaces.

Power connections

Load Output
Output position identified as Load Output in the brochure.
Grid Input
Connection position identified as Grid Input.
Generator Input (optional)
The generator input is explicitly marked optional in the original callout.
PV Input
PV connection area identified by the original callout.
PV1 Input Breaker
Breaker identified for PV1 Input.
PV2 Input Breaker
Breaker identified for PV2 Input.

Communication

Communication Port
Connection area labelled Communication Port. No protocol pin assignments are specified in this component view.

Controls & indicators

Battery Breaker
Breaker labelled for the battery section.
Load Breaker
Breaker identified for the load connection.
Grid Breaker
Breaker identified for the grid connection.

Source: Residential ESS brochure · PDF page 8 · printed pages 15-16